Dust noise monitoring system is stationed in Weihai, Shandong

The reporter learned from the Housing and Urban-rural Construction Bureau of Weihai City, Shandong Province that, since March, the construction of houses, municipal infrastructure and houses demolished in Weihai, especially those that are in the process of earthwork, must be equipped at the construction site before construction. Dust noise monitoring system that publishes air dust index. The monitoring equipment shall be installed in the gate of the construction site, etc., which can receive public supervision.

According to the "Shandong Province 2013-2020 Air Pollution Prevention and Control Plan Phase II Action Plan (2016-2017)", Weihai City insists on prevention and combination of prevention and control, and civilized construction of housing construction, municipal infrastructure and house demolition construction work site 1. Requirements for dust control work to promote the continuous improvement of the atmospheric environmental quality of Weihai City.

In terms of dust detection records and early warning response, a special person should be assigned at the construction site to observe and record the dust monitoring data, and regularly organize and archive the test data. When the monitoring data exceeds the environmental protection standard value, the dust emergency response plan is immediately started, the construction operation is stopped, and measures such as covering and watering are taken to reduce the dust. After the incident handling is completed, a qualitative analysis should be conducted on the phenomenon of data exceeding the standard, find the cause, formulate a solution, and make long-term preventive measures.

Strengthen the inspection and supervision of dust control. During the bidding process, the district and city construction bureaus should clearly require the cost of monitoring equipment as a safe and civilized construction cost to be included in the list of measure fees. In daily patrols and inspections, the monitoring of airborne dust and the operation of the system should be regarded as an important inspection item for civilized construction. Those under construction that have not established an airborne dust monitoring and disclosure system should be ordered to stop work for rectification, and when the situation is serious, they should be jointly punished by the environmental protection law enforcement department.

From April onwards, the operation and monitoring of airborne dust in projects under construction in various districts and cities will be included in the year-end assessment.

Dust noise monitoring system is stationed in Weihai, Shandong

Children's Table Wooden Study Desk Chair

Height-Adjustable sets: You can easily adjust height of table and chair sets according to the height of the child, accompanied with children growth for long-term use. Study Chair for kids can easily satisfy children at any age (3-15 Years).And the chair backrest is also adjustable to give your child a better comfort

2 Jpg

Wooden Study Desk Chair,Ergonomic Adjustable Study Desk,Children Furniture Study Table,Ergonomic Computer Desk

Igrow Technology Co.,LTD , https://www.aigrowdesks.com

Posted on